Remember when:
Construction Pictures as of 6/26/2008. It is wonderful to see the progress that has been made in a month's time.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Construction Pictures as of 5/30/2008
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Construction remains on target.
5/9 Construction Update
Inside a 5th Grade classroom 4/23/2008
The kitchen area of the cafeteria 4/23/20084-5 Hallway
5th Grade Classroom
Back of School
Bus Lot Image update
Cafeteria

Typical K-1 Classroom which includes a restroom.

Main Office Hallway

Wow, the cafeteria is really under construction!!

Inside photo of portion of the media center

Bus Lot under construction. Soon to be completed. Awesome!!!


Frontal view of media center
Main Entrance as of 4/8/2008
The work on the bus lot has begun.
4/8/2008
4/8/2008
3.2.08 Steel Frame of the Principal's office and main offices.
3.2.08 Side view of the front of the school.
3.2.08 Main Entrance to the school.
3.2.08 Most of the 4/5 wing has windows.
3.2.08 Wow, the front of school
3.2.08 4/5 classroom with window

3.208 Side View of 4/5 Hallway with windows.
3.2.08 Side view of Storage area

Updated Feb. 4, 2008 WOW!!
We are on the move!!
Construction is a daily job.
We have a dedicated team.
Bricks! Hooray.
We will have a beautiful front!